Before signing a solar contract in Sydney, key questions for your installer should cover their Solar Accreditation Australia (SAA) credentials, the specifics of a 6.6kW system (costing roughly $5,000 – $7,500 after rebates), and detailed panel and inverter warranties. A typical 6.6kW system in Sydney should generate about 26 kWh per day. Ensure your quote itemises costs and includes panel brands like REC or Trina. In 2025, NSW residents can access the federal Small-scale Technology Certificate (STC) rebate, reducing costs by around 30%, and potentially a new federal battery rebate of about 30% off the upfront cost for systems like a Sungrow SBR battery. Also, confirm the workmanship warranty period and post-installation support plans.
Choosing a solar power installer in Sydney is a significant decision. The right partner can set you up for decades of clean energy and bill savings, while the wrong one can lead to underperformance, safety issues, and costly repairs. To ensure you make a confident and informed choice, it’s crucial to ask targeted questions before signing any solar installation contract.
As industry experts, we’ve analysed hundreds of quotes and spoken with countless homeowners. This guide outlines the essential questions you need to ask, covering everything from licensing and warranties to system performance and government incentives available in NSW.
Questions to ask a solar installer before contract Sydney

Before you commit, your primary goal is to verify the installer’s legitimacy, experience, and the quality of the products they offer. A reputable solar installer will welcome these questions and provide clear, verifiable answers.
Key questions to ask your solar installer include:
-
Company Experience: How long has your company been operating in the solar industry, and how many installations have you completed in the Sydney area?
-
Accreditation and Licensing: Can you provide your Solar Accreditation Australia (SAA) number and your NSW electrical contractor licence number?
-
Subcontractors: Will your own employees be completing the installation, or will you use subcontractors? If so, are they also SAA-accredited?
-
Product Details: Which specific brands and models of solar panels and inverters are you quoting? Why did you choose these for my home?
-
Warranty Support: Who is responsible for handling warranty claims for the panels, inverter, and workmanship? Is there a local Australian office for the product manufacturers?
-
Timeline: What is the estimated timeline for the entire process, from signing the contract to the system being fully operational?
-
Payment Terms: What are the payment terms? Reputable installers typically ask for a deposit, with the final balance due upon completion, not before.
AU Solar Panels’s Pro Tip: Always ask for references from past customers in your local Sydney area. A confident installer with a history of quality work will be happy to provide them. This is one of the best ways to gauge customer service and workmanship quality.
Solar installer accreditation and licensing requirements NSW
In New South Wales, the installation of solar panels is strictly regulated to ensure safety and quality. Your installer must hold specific licences and accreditations.
-
Electrical Licence: The installation must be carried out or supervised by a qualified electrician with a current NSW electrical contractor licence. It’s illegal for unqualified individuals to perform electrical wiring work.
-
Solar Accreditation Australia (SAA): To be eligible for federal government incentives like STCs, the system’s designer and installer must be accredited by Solar Accreditation Australia (SAA). SAA has become the primary industry standard, so be wary of installers who only reference outdated accreditations.
-
Home Building Compensation Fund: For any residential building work valued at over $20,000, the contractor must provide you with a certificate of cover from the Home Building Compensation Fund.
You can verify an electrical licence on the Service NSW public register. This is a non-negotiable step to protect your investment and ensure the safety of your home.
What to check in a solar installation quote Sydney
A detailed, transparent quote is a hallmark of a professional solar power installer. Vague or incomplete quotes are a major red flag. Your quote should be a comprehensive document that leaves no room for ambiguity.
Here’s what to look for in your solar contract:
-
Itemised Component List: The quote must clearly list the brand, model, and quantity of all major components, including solar panels, inverter, and mounting hardware.
-
System Performance Estimate: A reputable installer will provide a performance estimate, including the projected average daily energy output in kilowatt-hours (kWh).
-
Full Breakdown of Costs: The quote should detail all costs, including GST. It should clearly show the total system price before the STC rebate and the final price you will pay after the rebate is applied.
-
Timeline for Installation: A clear start and completion date should be provided.
-
Warranty Information: All warranty details for panels (product and performance), the inverter, and the installer’s workmanship must be clearly stated.
| Item to Check | What to Look For |
|---|---|
| Panel & Inverter Models | Specific model numbers (e.g., REC Alpha Pure-R, Sungrow SG5.0RS). |
| Total Cost | A clear breakdown of the gross price, STC discount, and final net price. |
| Warranties | Minimum 10-15 year product warranty for panels, 10 years for inverter, and 5 years for workmanship. |
| Installer Details | Company name, ABN, and SAA accreditation number. |
Solar panel and inverter warranties explained Australia
Warranties are your safety net and a critical indicator of product quality. They are often misunderstood, so it’s essential to understand the different types.
-
Solar Panel Product Warranty: This covers defects in materials and manufacturing. A good quality panel will have a product warranty of at least 15 to 25 years. This is arguably the most important panel warranty.
-
Solar Panel Performance Warranty: This guarantees the panel will maintain a certain level of output over its lifespan, typically 80-90% of its original output after 25 years. Solar panel energy generation naturally decreases over time, a process known as degradation.
-
Inverter Warranty: The inverter is the hardest-working part of your system and the most likely to fail. Look for a minimum 10-year product warranty. Some premium brands offer 12 years or more. Be wary of “5+5” year warranties, as the second 5-year period often doesn’t cover labour or transport costs.
-
Workmanship Warranty: This is provided by your installer and covers defects related to the installation itself, such as roof leaks or faulty wiring. A minimum of 5 years is standard, but many reputable installers offer 10 years.
Questions about solar system performance and output Sydney

Understanding how much energy your system will produce is key to calculating your return on investment. In Sydney, solar output is generally reliable.
-
Average Daily Output: On average, each kilowatt (kW) of solar capacity in Sydney generates about 3.9 kWh of electricity per day. Therefore, a standard 6.6kW system should produce around 26 kWh daily.
-
Factors Affecting Output: Performance can be influenced by roof orientation, shading from trees or buildings, panel angle, and weather conditions.
-
Monitoring Systems: Ask if the quoted inverter includes a monitoring system (usually via a smartphone app) that allows you to track your energy production and consumption in real-time. This is vital for maximising your energy savings.
Case Study: A Family in Parramatta The Chen family was dealing with quarterly power bills approaching $700. They installed a 6.6kW system using Trina panels and a 5kW Sungrow inverter for a total cost of $6,200 after the STC rebate. Their system now generates over 25 kWh on an average day, and their annual savings are exceeding $2,100. This puts them on track for a payback period of under 3 years, and their last bill was just the standard grid connection fee.
NSW solar rebates and incentives 2025
In 2025, Sydney homeowners can still access significant financial incentives to reduce the upfront cost of a solar panel and battery system.
-
Small-scale Renewable Energy Scheme (SRES): This federal scheme provides an upfront discount by creating Small-scale Technology Certificates (STCs). For a 6.6kW system in Sydney, this can reduce the cost by several thousand dollars, often representing a discount of up to 30%. Your installer will typically handle the STC process and include the discount in your quote.
-
Cheaper Home Batteries Program: A new federal battery rebate launched in July 2025 offers a point-of-sale discount of around 30% on eligible home batteries. This can be combined with other incentives.
-
VPP Incentives: While the main NSW battery rebate ended, the state now offers incentives for connecting your battery to a Virtual Power Plant (VPP). A VPP allows the grid operator to use your stored energy during peak demand in exchange for payments or bill credits.
Solar installation process and timeline Sydney
Knowing what to expect during the installation process can help ensure a smooth experience. The entire process, from signing the contract to system activation, typically takes between two and six weeks.
-
Initial Stages (1-2 weeks): After signing the contract, your installer will conduct a final site assessment and design the system. They will also handle permit applications with your local council and energy distributor (e.g., Ausgrid).
-
Physical Installation (1-2 days): The on-site installation for a standard residential system is usually completed within one to two days. This involves installing the mounting rails, attaching the panels, and wiring the inverter.
-
Grid Connection and Metering (1-3 weeks): After the physical installation, an Accredited Service Provider (ASP) may need to connect the system to the grid and install a new smart meter. You cannot switch the system on until this is completed.
Post-installation support and maintenance for solar systems Australia
Your relationship with the installer shouldn’t end once the system is turned on. Reliable post-installation support is crucial for long-term peace of mind.
-
System Handover: Upon completion, your installer should provide a full handover, including documentation and instructions on how to operate and monitor your system.
-
Maintenance: Solar panels require minimal maintenance, but regular cleaning (at least annually) is recommended to ensure optimal performance, as dirt and grime can reduce efficiency.
-
Troubleshooting and Support: Ask your installer about their process for handling post-installation issues. Do they have a dedicated support team? A good installer will offer ongoing support to help with any performance or warranty-related queries.
Common problems with solar installations in Sydney
While solar technology is highly reliable, poor installation practices can lead to problems. Awareness of these issues can help you select a quality installer.
-
Roof Leaks: Improperly sealed roof penetrations or cracked tiles during installation can cause leaks. A thorough installer will assess your roof’s condition beforehand.
-
Inverter Failures: As the most complex component, inverters can sometimes fail. This highlights the importance of choosing a brand with a strong 10-year warranty and local support.
-
Underperformance: This can be caused by issues like incorrect installation, shading that wasn’t accounted for, or component faults. Regular monitoring helps detect underperformance early.
-
Outdated Wiring: Older Sydney homes may have wiring that is not suitable for a modern solar installation, potentially causing delays or requiring a switchboard upgrade.
Asking the right questions is the most powerful tool you have when investing in solar. By using this guide, you can confidently navigate the process of finding a reputable Sydney solar installer and secure a high-performing, reliable system for your home.